Sign In | Join Free | My uabig.com |
|
Brand Name : Zhenglan cable
Model Number : 2KV TTU cable al/pe/pvc power cable as per ICEA S-95-658 underground cable
Certification : ISO 9001:2015, ISO 14001:2005, OHSAS 18001:2007
Place of Origin : Henan, China
MOQ : 1000 meters
Price : 0.5-100USD/M
Payment Terms : L/C, T/T, Western Union
Supply Ability : 60000m/day
Delivery Time : 20 Working Days
Packaging Details : Fully wooden drum, steel wooden drum, fully steel drum or customized
Material : aluminum
Insulation : XLPE/PE
Sheath : PVC-st2
Out Sheath Color : Black
Cable Length : as per requirement
Voltage : 2KV
Standard : ICEA S95-658
Port : Qingdao
2KV TTU cable al/pe/pvc power cable as per ICEA S-95-658 underground cable
Application:
Construction:
Polyethylene insulation (PE- 75°C) resistant to abrasion, heat and humidity and an external jacket of Polyvinyl Chloride (PVC) flame retardant and weather resistant.
2KV TTU cable al/pe/pvc power cable as per ICEA S-95-658 underground cable technical Parameters:
Cable size (AWG o kcmil) | Cable size(mm²) | No. of wire | Insulation thickness(mm) | Outer sheath thickness (mm) | Overall diameter (mm) |
4/0 | 107,2 | 19 | 2 | 1.14 | 18.53 |
0.6/1kv single core unarmored power cable xlpe insulated 1x185mm2 IEC60502-1/IEC60228/IEC60332-3-24 Test equipment:
About zhenglan cable:
Zhenglan Cable Technology CO., Ltd.,formerly known as HENAN Zhengzhou Cable Co., Ltd., is one of the large scale backbone enterprises in China's wire and cable industry. The company's registered capital is about 4 million 6 thousand yuan and its headquarter is located in 49 floor of the South Tower of the Greenland Center of Zhengzhou high railway station (Petronas Twin Towers). The factory is located in the Zhengzhou cable science and Technology Industrial Park of the Wuzhi industrial area. It is a modern industrial park integrating advanced research and development technology and production technology.
Why Choose Zhenglan Cable:
RFQ:
1. Is your company a factory or a trade company?
Factory, more than 20 years in China
2. How long can I expect to get the sample?
After you pay the freight charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3~7 days. You can use your own express account or prepay us if you do not have an account.
3. What are your payment terms?
We normally accept T/T 30% deposit, 70% balance before delivery as the main payment terms, and other payment can also be negotiated. Trade assurance on is also available.
4. What’s the delivery time?
Sample order needs 3~5 days.
Formal order depends on the quantity, usually it needs 15 working days after get your payment.
5. What is your MOQ?
Generally it is 1000m.
![]() |
2KV TTU Al/Pe/Pvc Power Underground Cable As Per ICEA S-95-658 Images |